A cable-stayed bridge is a bridge that consists of one or more columns (normally referred to as towers or pylons), with cables supporting the bridge deck.
Like suspension bridges, cable-stayed bridges are held up by cables. However, in a cable-stayed bridge, less cable is required and the towers holding the cables are proportionately shorter. The first known cable-stayed bridge was designed in 1784 by C.T. Loescher. The longest cable-stayed bridge is the Sutong Bridge over the Yangtze River in China.

There are two major classes of cable-stayed bridges: In a harp design, the cables are made nearly parallel by attaching cables to various points on the tower(s) so that the height of attachment of each cable on the tower is similar to the distance from the tower along the roadway to its lower attachment. In a fan design, the cables all connect to or pass over the top of the tower(s).


The cable-stay design is the optimum bridge for a span length between that of cantilever bridges and suspension bridges. Within this range of span lengths a suspension bridge would require a great deal more cable, while a full cantilever bridge would require considerably more material and be substantially heavier. Of course, such assertions are not absolute for all cases.



A multiple-tower cable-stayed bridge may appear similar to a suspension bridge, but in fact is very different in principle and in the method of construction. In the suspension bridge, a large cable is made up by "spinning" small diameter wires between two towers, and at each end to anchorages into the ground or to a massive structure. These cables form the primary load-bearing structure for the bridge deck. Before the deck is installed, the cables are under tension from only their own weight. Smaller cables or rods are then suspended from the main cable, and used to support the load of the bridge deck, which is lifted in sections and attached to the suspender cables. As this is done the tension in the cables increases, as it does with the live load of vehicles or persons crossing the bridge. The tension on the cables must be transferred to the earth by the anchorages, which are sometimes difficult to construct due to poor soil conditions.